Abu Rawash Wastewater Treatment Plant

Sector .

Infrastructure

Year .

2022

Client .

Construction Authority for Potable Water and Wastewater (CAPW)

Location .

Giza, Egypt

Role .

Partner in a JV with Aqualia

Project Details

Abu Rawash Wastewater Treatment Plant

In addition to the EPC scope, works included the operation and maintenance of the facility for three years.

This facility is designed to recycle an impressive 1.6 million m3/day(expected to reach 2 million m3 in the coming years) of treated sewage water, ultimately providing clean water for 9 million residents.

Data Center (Iowa)

Next Project

Data Center (Iowa)