Hamma Seawater Desalination Plant

Sector .

Infrastructure

Year .

2007

Client .

Hamma Water Desalination Spa

Location .

Hamma, Algeria

Role .

Partner in a JV with BESIX

Project Details

Hamma Seawater Desalination Plant

EPC works of a 200,000 m³/day seawater desalination plant.

Scope of Orascom Construction included the following:
An onshore intake structure and pump house
Seawater pump house bar screen(s) leading to the intake basin
Four (4) 331/3 % capacity vertical wet pit seawater intake pumps (one standby), materials of construction are suitable for seawater environment with variable speed drives/controllers
Stop logs or other device to allow an individual pump chamber to be drained for access during maintenance (drain sump and pump).
Associated piping, valves and expansion joints and instrumentation for seawater service.

GE Ionics was the technology provider.

Sky Train

Next Project

Sky Train