Infrastructure
2010
Ministry of Electricity and Energy – New and Renewable Energy Authority
Kuraymat, Egypt
Main Contractor
Kuraymat is Egypt’s first Integrated Solar Combined Cycle power plant. The scope of work included site leveling, roads, storm water drainage, utility area, administration building, supply of spare parts and special equipment, as well as supply and installation of parabolic trough system supporting structures.